This book examines in great detail the D-B and IPD methods, while touching on D-B-B and CM project deliveries. In this vein, the discussion regarding IPD is a variation from ASHRAE Technical Committee TC 7.1, Integrated Building Design (IBD), with the focus herein on HVAC-Led...